Project: Primary Care Centre at Croom, Co. Limerick
Completion Date: October 2020
Client: Thomond Healthcare Holdings Limited, Zest Healthcare
Project Value: €2.24m
Services Provided: Civil & Structural Engineering Services
Project Size: 1,280m²
  • Croom PCC
  • Croom PCC
  • Croom PCC

Project Description

This is a state of the art primary care centre to service the community of Croom, Co Limerick.

The building is a 2 storey structure with a gross floor area totalling 1,280m2. The project also included the construction of a single storey annexe, a 60 surface car-parking spaces at grade and a new entrance to the site from the existing roadway. The project required the construction of a new storm-water drainage outfall to the Liskiltagh River and all associated site works.  The site levels were manipulated to retain a potential  flood storage volume post development of the site. 

 

 