Wellman Treatment Plant
Project: | Wellman Treatment Plant, Mullagh, Kells, Co. Meath |
Completion Date: | 2012 |
Client: | Wellman International Ltd. |
Project Value: | €0.15m |
Services Provided: | Civil and structural engineering, project management and project supervisor design process (PSDP) |
Project Size: | 2 Treatment Tanks |
Project Description
The project involved the installation of a new waste water treatment plant within the site of Wellman International’s factory in Mullagh, Kells, Co. Meath. The new treatment plant comprised of two new pre-cast concrete tanks, 12m and 6m in diameter, 6m and 3m high respectively. The new installation is adjacent to the existing treatment facility. The project involved the relocation of existing services, the installation of drainage within the existing open ditch, installation of an aeration system and other assocaited works.